General
- GALENIKA – PHARMACEUTICAL FACTORY, Belgrade, Serbia
- Investor: GALENIKA a.d. Beograd, Batajnički drum bb, Zemun, Beograd
- Partner: BWK ENGINEERS doo
Highlights
- Area: cca 14.560 sqm
- Transformer substation 10/0.4 kV, 2x2000kVA
- 2 transformers, 4 MVA installed power
- 2xDG set: 1.825 MVA and 1.675 MVA
- Clean rooms
- Building constructed in 1990s, now is done renovation and finalization
Our work
Construction design of:
- Transformer substation
- LV design
- Main LV power supply –cables and cable trays
- Lighting installations
- Small power installations
- Lightning installations
- ELV installations
- Fire alarm system
- Access control system
- Structured Cabling System
- Gas detection system
- Public address
- CCTV system
- Intercom system
- WiFi system
- Airlock system